About Us Our Strengths Projects Facilities Management News Careers Home Contact Us

Contract Name : New Coast Guard Harbour Main, Civil & Building Works at Sidab
Client : Royal Oman Police
Location : Muscat- Sidab
     

The works comprise of civil works and Building works of New Coastal Guard Harbour at
Sidab for Royal Oman Police. Works split into three packages, Package - 1 Marine and
Infrastructure and Package - 2& 3 Buildings.

Package – 1 Marine Works Excavation, backfilling and reclamation work of north, east,
south and south west quays. Construction of 370m long main breakwater and 75m long lee
breakwaters and revetments and Construction of north quay wall, ship lift and slipway, east
quay and slipway, south and south west quay wall, floating berths, navigation system.

Infrastructure
Road work and paving’s to the harbour side area, Construction of Helipad, Landscaping works, Security fences, Utility services including power, water, drainage and communications

Package - 2
Two storeys Diving Crew Centre with diving pool, offices and accommodation. RC frame
structure constructed on pile foundation. 42m high Watch Tower constructed in RC frame
on pile foundations, three storeys Marine Control Tower, Service block and Guard house.

Package - 3
Three storeys RC framed Command Building (Floor area 4300m2), 2 no. of three storey
RC framed P. C Barracks (Floor area 3610m2 x 2 no= 7220m2) and Single story RC framed
Kitchen & Dining Block (Floor area 1343m2).

 
 
 
Click here to view the Carillion PLC Section
 

© 2010 Carillion Alawi

Carillion Alawi LLC is not responsible for the content of external Internet sites.
Please see our Copyright and Terms & Conditions.